House Construction Process for Transportable Homes

Posted by Transportable Homes on September 19, 2010 under Portable Homes, Transportable Homes | Read the First Comment

Actually, Use A Modular House Construction Process Regardless!

 

Because so many new home builders opt to have their homes built using modular homes construction methods instead of traditional house construction; I have outlined the 21 Step house construction process for transportable homes below (assuming you have a block of land already).

 

Step 1
As with all new home builders, you should visit a variety of modular homes display sites where you can walk through open homes and talk to the consultants about features and benefits of their housing options. At this stage you are just checking everybody out and going through a process of elimination.

 

Step 2
Choose the transportable homes building contractor who best fulfills your building needs and who’s homes reflect your personal style.

Make an appointment to discuss your ideas further with their consultants. At this meeting you will be asked details about your block of land, budget when building a house, ideal home size and layout, etc. Take as much information as you can to assist; like photos, plans, sketches, surveys, magazine clippings, etc.

 

Step 3
Based on the information you provided in Step 2, the transportable homes building contractor will take about a fortnight to draw a concept sketch combining all your ideas and preferences. This part of the planning process is enormously exciting to new home builders as their concepts come to fruition.

 

Step 4
Revisit the transportable homes building contractor to look over the concept sketch. Tweak, modify or totally change elements that do not make sense now that you see them all compiled together as your future home. Most second drafts are free of charge. Make sure you are 100% happy and satisfied with the final draft of your future home before moving to step 5.

 

Step 5
Make a financial commitment towards your future transportable home by making a deposit (usually deducted from the final contract payment) and signing a preliminary agreement.

 

Step 6
Your chosen transportable homes building contractor will need to see your block of land (or site; some people place modular transportable homes on top of existing building) to check access, land suitability for building a house, slope, orientation, position of the home and whether your chosen design makes the most of your land.

 

Step 7
Adjustments (if any) will be made and your concept drawings will be finalised. Geo-technical reports will be sorted out by your building contractor to determined how engineering and construction activities will impact on your site. One of the key features for new home builders building a house in a factory setting is the distinct lack of impact on flora and fauna. Feature surveys will also be investigated to locate services like fire hydrants, kerb heights, etc.

 

Step 8

Contract time. A safe option for new home builders is an HIA (Housing Industry Association) contract, as it is standard in the Australian building industry. To this contract you  can add specific inclusions, identify standard inclusions you don’t want and bring formalised attention to other stipulations unique to your projects success. Usually you have a deposit to be paid at this point which covers design costs.

Now you are at the stage in the planning process when your transportable home can be submitted to Council for approval and the planning process really begins. Note: If you feel comfortable, you can cut costs in the transportable homes planning process by submitting your project to Council yourself at this point. Usually it takes about three months for approvals on average (some take up to two years if the structure of the land is complex or unstable, you wait for zones to change, etc).

 

Step 9
If you have settled on a standardised plan and have minimal changes, the drawings process will be very quick; as it has been done several times before. However, if you have a totally unique and customised floor-plan, then it is now when very detailed drawings will be produced (over a two week period on average) by your transportable homes building contractor to help with the planing process and with building applications.

 

Step 10
It is now that you need to be seriously looking for finance if you have not started out with a pre-approved loan, you should begin searching for a good deal immediately. Some larger transportable homes building contractors have their own finance available if you are building a house through them. New home builders should be aware that although this may be an easier way to get finance, it may not be as competitive; so check out the fee structure and interest rates thoroughly.

 

Step 11
If you are required to have a planning permit to determine the use and/or development of your land, then either you or your building contractor can arrange this. Building permits are different in that they pertain only to the construction of a development only, not what the land can be used for (either you or your transportable homes building contractor can aquire it). Usually the manufacturer of your transportable home will have their own building surveyor to make the building a house process easier; if not, they will sub-contract the work out. The building permit takes approximately two weeks.

 

Step 12
Your transportable home project is locked into the manufacturing plant’s schedule to enable your home construction. At this stage in your home construction, your transportable homes building contractor may need to visit your block of land if they haven’t already done so (usually it is free for the first 100 k’s). Now, you will be required to pay for the site-visit/s, deposits for milestones or benchmarks that have been reached, and for site specific permits that your Council requires. Of course, if you arranged for your building contractor to do all the compliance side of things; then you will probably have to pay for that service at this stage, too.

 

Step 13
As each new benchmark or milestone is reached in the home construction process, you will be obligated to pay further financial installments. Normal house construction for a transportable home is three months. It is advisable to visit your transportable homes building contractor; to inspect the progress of your home construction and check it is living up to your expectations. Building a house using modular building methods is fast and may require a few visits (some people formalise a couple of visits in their contract to be extra safe; coinciding with their home construction)

 

Step 14
During your transportable home construction, the footings need to be done on site. Your transportable homes building contractor can do this in about two days (for a price) or you can do-it-yourself (DIY) to save yourself some hard earned money. There are several foundation options available.

 

Step 15
Organising of utilities (power, water, sewage, gas, etc), so when your transportable home has completely finished the house construction phase and been delivered on-site; you will be able to connect to these services. Most transportable homes building contractors can include all of this in your contractor if you want to pay extra, or you can do his yourself and save money.

 

Step 16
In the final stage of your house construction, visit your transportable homes building contractor’s manufacturing plant and walk through your new home. Are you 100% happy with it? If not, amendments will need to be made before it leaves the factory’s production line. Otherwise, if everything is fine; you can sign it off. Depending on whether or not you have purchased to lock-up or not, you may be required to make another payment; usually this is the largest single payment you will make during the house construction process.

Truck freighting transportable home moduleStep 17
Trucks arrive at your transportable homes building contractor’s manufacturing plant and load the individual modules onto flat-decks; the more modules, the more trucks and possibly pilot vehicles to alert traffic on the journey to your block of land.

 

Step 18
If you have paid for installation services to be performed by your transportable homes building contractor, then they will be on-site before the trucks arrive. If you live a long distance from your building contractor’s factory and you have enlisted local Tradesmen or have bravely chosen to do-it-yourself, then you (or they) must be on-site before the module/s start arriving.

Some trucks have hy-abs, or a crane may be required to lift the modules into place (to be organised by you or your building contractor; depending on how many services you want the professionals and experts to do).

 

Step 19
Once assembled, the modules need to be joined and finished by the crew of building tradesmen. This can take a day; or for a large project with many modules, the ‘finishing’ part of the house construction process can take up to a week (maybe two). If you included a driveway, landscaping and a swimming pool in your contract; then obviously your transportable homes building contractors are going to be on-site for longer (or local tradesmen, if you live a long distance from your building contractor’s manufacturing plant).

 

Step 20
Inspection time. Go through your brand-new transportable home meticulously with your transportable homes building contractor. Once you are happy; sign off and make another progress payment.

The building surveyor (yours or your building contractor’s) will then be given the compliance certificates from either your sub-contractors or your transportable homes building contractor’s sub-contractors. When this happens, a certificate of occupancy is issued and you are due to make your final progress payment (minus any preliminary deposits paid)

 

Step 21
Now, you have legal access rights to your new transportable home, be able to take possession and be given the keys to your new-smelling, state-of-the-art, instant and cost effective Transportable home.

 

 

Note: All transportable homes building contractors have different processes when building a house, fluctuating  factory schedules to balance and payment expectations for benchmarks and milestones once achieved. It is important that you know exactly how they operate, what they expect and when they expect it.

 

In Summary
I strongly recommend all new home builders consider modular building methods as they are the ultimate house construction process; they are quick, efficient, cost effective and have less impact on the environment in most cases.

 